
Background
A cast iron foundry had been running six rotary screw compressors to service their bag houses, air motors, and pumps.
Manufacturing Challenge
An increase in production required a minimum of 4500 CFM above the current air produced at the foundry.
Results
The foundry was able to save over $55,000 in maintenance and energy savings while increasing its air demand.
Download our case study to see how they did it.