Molded Plastics Case Study

Please fill out the form below to have this case study emailed to you.

We respect your privacy and will never sell, rent or share your email address. You may receive future emails from FS-Elliott and can unsubscribe at any point. Online Privacy Policy & Terms of Use.
 

CASE STUDY:

How a cast iron foundry added an additional 4500 CFM and reduced their energy consumption. 

Background
A cast iron foundry had been running six rotary screw compressors to service their bag houses, air motors, and pumps. 

 

Manufacturing Challenge
An increase in production required a minimum of 4500 CFM above the current air produced at the foundry. 

 

Results
The foundry was able to save over $55,000 in maintenance and energy savings while increasing its air demand. 

 

Download our case study to see how they did it.