Molded Plastics Case Study

Please fill out the form below to have this case study emailed to you.

We respect your privacy and will never sell, rent or share your email address. You may receive future emails from FS-Elliott and can unsubscribe at any point. Online Privacy Policy & Terms of Use.
 

CASE STUDY:

How one of the world's largest single-site ethylene plants saved over $100K/year and increased demand.

Background
One of the world’s largest single-site ethylene facilities needed to upgrade its air system.
 

Manufacturing Challenge
They needed to increase capacity while reusing the existing layout for minimal civil changes without disturbing key plant components. Complying with API 672 Basic Duty requirements was also important to ensure reliable and continuous instrument air supply while limiting overall ownership costs.
 

Results
The plant saved over $100,000 in maintenance and energy savings. 

 

Download our case study to see how they did it.